Aug 5 2010
On 2nd August 2010, CCCC Second Harbor Engineering Co., Ltd. won Section 1 of Jingning highway reconstruction project.
The bidding price amounted RMB130 million with construction period of 26 months.
This highway is 29.8km long with 12 bridges and four tunnels. While Section 1 is 15km long and composed of roadbed, drainage, waterproofing, bridge, culvert and tunnels, etc.
Source: http://www.ccccltd.com.cn/