May 26 2010
On 14th May 2010, CCCC Second Harbor Engineering Co., Ltd. won Section WG15 of Lanzhou-Haikou National Highway project in Gansu province. The bidding price amounted to RMB500 million with construction period of 36 months.
This highway is 130km long with dual two-lane. Section WG15 is 6.9km long and composed of 21 large bridges, three middle-sized bridges, one small bridge, nine culverts, 10 tunnels, one separated interchange, and one interchange.
Source: http://www.ccccltd.com.cn/