Mar 3 2010
On 1st March 2010, CCCC Second Harbor Engineering Co., Ltd. won Section 13 and 14 of Zunyi-Bijie Highway. The bidding price amounted to RMB570 million with construction period of 29 months.
This highway is 172km long and 33.5m wide with dual three-lane. Section 13 is 5.7km long and composed of four bridges, eight reinforced concrete slabs, 11 channels, one arch culvert, one interchange, and three overpasses. While section 14 is 5km long and composed of four bridges, one reinforced concrete slabs, seven channels, and one interchange.
Source: http://www.ccccltd.com.cn/