Posted in | News

L.B. Foster Secures $4.5M Contract to Supply Steel Grid Decking for Liberty Bridge

L.B. Foster Company has been awarded a $4.5 million contract to provide 171,000 square feet of steel grid decking to general contractor Joseph B. Fay Company for the rehabilitation of Pittsburgh’s Liberty Bridge.  The Pennsylvania Department of Transportation (PennDOT) and their engineering consultant, HDR, Inc., specified steel grid reinforced concrete deck panels for the Monongahela River bridge because the product’s strength-to-weight ratio and modular nature addressed key project objectives.

The new fabricated steel material will be manufactured at the nearby L.B. Foster bridge products facility in Bedford, PA with shipments beginning to the jobsite in March 2016.  L.B. Foster’s custom engineered panels will be produced to exacting specifications to expedite installation and minimize traffic disruption on the critical downtown Pittsburgh span.  Concrete will be poured into the steel decking to produce a structurally efficient grid system that increases span capacity and minimizes deck weight.

“Steel grid decking streamlines installation, promotes long-term performance and lowers life cycle costs over alternate bridge deck designs,” said Chris Davis, L.B. Foster Fabricated Bridge Products Sales Manager.  L.B. Foster’s AISC-certified Bedford plant maintains the largest production capacity in the industry for the manufacturing of this innovative deck material. The Pennsylvania facility also produces bridge railings, stay-in-place bridge deck forms and miscellaneous fabricated bridge components.

About L.B. Foster Company

Established in 1902, L.B. Foster Company is a leading manufacturer, fabricator and distributor of products and services for the rail, construction, energy and utility markets with locations in North America and Europe.  The Fabricated Bridge Products group of L.B. Foster has been a leading provider of structural steel, bridge decking, bridge forms and railing for the construction and rehabilitation of bridges, highways and buildings for more than 40 years.  More information is available at: www.lbfoster.com

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.