Posted in | News

S+C to Offer Engineering Services for Calico Solar Plant in California

S&C Electric Company, a leader in integrating renewable energy sources to the grid, today announces that it was awarded a contract to perform engineering services for one of the largest solar plants in the world, Calico Solar.

The plant, located near Barstow, California, is being developed by Tessera Solar and EPC firm Mortenson Construction and will utilize the Stirling Energy Systems (SES) SunCatcher™ solar dish Stirling systems to provide 850 MW of clean electricity to consumers.

S&C offers extensive experience in designing the electrical systems needed to integrate renewable energy plants.  Calico Solar is the second Tessera Solar plant for which S&C's Power Systems Services Division is providing engineering services through Mortenson Construction.  S&C is also providing engineering services for the 27 MW Western Ranch Solar plant that is planned near Marfa, Texas. S&C also supplied electrical switching and metering equipment for the 1.5 MW Maricopa Solar plant, which is operational in Peoria, Arizona.

"As communities around the world look to increase usage of renewable energy, one of the major challenges we face is finding ways to make these new technologies more cost-effective," said Wanda Reder, Vice President—Power Systems Services, S&C.  "S&C is applying our expertise in integrating renewable plants to identify more efficient ways to install and maintain the electrical connection systems for these plants, and is thus helping to make this cutting-edge technology viable."

For the Calico Solar plant, S&C's engineers will ensure the plant can be connected successfully to the grid without impacting stability or reliability of the utility's transmission system.  Services will include power flow modeling of the SunCatcher system; stability, short circuit coordination, and dynamic simulation studies; and design of the collector system.  S&C has also revised dynamic modeling of the SunCatcher, integrating control system improvements by SES, the manufacturer of the SunCatcher, into the electrical system model.

"Tessera Solar is fully behind the decision of Mortenson Construction, our EPC contractor for Calico Solar, in selecting S&C Electric Company as engineering service provider for the project given the proven track record of S&C in the renewable energy space," said Marcelo Figueira, Tessera Solar COO.

Source: http://www.sandc.com/

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.